RFT-2023-015 – Sidewalk Replacement Project 2023 Update.

Scope of Work

The contract involves the Sidewalk Replacement Project 2023 in the Township of King. The awarded work consists of:

  • Sidewalk Removal and Replacement:
    • Removal and disposal of 236.86 m² of existing concrete sidewalks.
    • Application of saw cutting (230 m) to create smooth transitions between old and new surfaces.
    • Installation of new AODA-compliant pedestrian ramps to improve accessibility.
    • Placement of granular base material for sidewalk stabilization before pouring new concrete.
  • Curb and Gutter Installation:
    • Installation of 100 m of new concrete curb and gutter to improve drainage and pedestrian safety.
    • Integration of curbs with existing stormwater management systems.
  • Traffic Control and Site Safety:
    • Implementation of temporary pedestrian detours and work zone protection barriers.
    • Coordination of road closures as required for public safety.
    • Compliance with Ontario Traffic Manual (OTM) Book 7 regulations for work zone safety.
  • Site Restoration:
    • Grading and placement of topsoil and sod to restore affected areas.
    • Removal of all construction debris and final site cleanup.