Scope of Work
The contract involves the Sidewalk Replacement Project 2023 in the Township of King. The awarded work consists of:
- Sidewalk Removal and Replacement:
- Removal and disposal of 236.86 m² of existing concrete sidewalks.
- Application of saw cutting (230 m) to create smooth transitions between old and new surfaces.
- Installation of new AODA-compliant pedestrian ramps to improve accessibility.
- Placement of granular base material for sidewalk stabilization before pouring new concrete.
- Curb and Gutter Installation:
- Installation of 100 m of new concrete curb and gutter to improve drainage and pedestrian safety.
- Integration of curbs with existing stormwater management systems.
- Traffic Control and Site Safety:
- Implementation of temporary pedestrian detours and work zone protection barriers.
- Coordination of road closures as required for public safety.
- Compliance with Ontario Traffic Manual (OTM) Book 7 regulations for work zone safety.
- Site Restoration:
- Grading and placement of topsoil and sod to restore affected areas.
- Removal of all construction debris and final site cleanup.